How long does it take to build a website

Between 7 and 15 working days. What stretches a project is almost never the design: it's the copy and photos that don't arrive.

Between 7 and 15 working days: a landing page can be ready in a week and an online shop with a catalogue takes up to 15. That timeline is real and we agree it in writing before we start. What almost always stretches it isn't the design, it's the copy and the photos.

What happens on each day of the project?

The typical schedule for a business website, which is the most common project:

  • Days 1-2 — Kick-off. A call to understand the business, who you sell to and what you want visitors to do. We come out with the website's structure agreed.
  • Days 3-6 — Design. We show you the finished home page, not a sketch. If something doesn't fit, it's changed here, when it costs little.
  • Days 7-11 — Development. It's custom-coded, the content goes in and speed and technical SEO are optimised.
  • Days 12-14 — Review. You see it working, on your phone, and ask for adjustments.
  • Day 15 — Launch. It goes live, the domain is set up and we train you to manage it.

What really delays a website?

In order, based on what we see:

  • The copy. It's the number one cause. Nobody has time to sit down and write what their company does, and the project stalls there.
  • The photos. Especially for online shops: 200 products are 200 photos someone has to take.
  • Shared decisions. If four people have to approve the design, every round takes days.
  • Logins. Domain, hosting, social media. They tend to turn up late and at the last minute.

Can it be sped up?

Yes, and it costs nothing: have the copy and photos ready on day 1. A project with its content prepared takes half the time of one where we keep asking for things.

If you don't have the copy, we write it ourselves from a call — but those are days of work that add to the timeline, not take away from it.

What we don't recommend is rushing the review stage. Launching without having checked it on your phone is the fastest way to end up redoing things.

What if I have a deadline?

Say so before we start. If you have a trade fair, a campaign or an opening, we plan backwards from that date and decide what goes into the first version and what's added later.

It's much better to launch a three-section website on time and expand it than to arrive late with all ten. A website that isn't ready on the day of the fair is no use at all.

Frequently asked questions

Are the 7-15 days working days or calendar days?

Working days. Two or three calendar weeks, depending on when public holidays fall and when the content reaches us.

Can I have the website in 48 hours?

A simple landing page with the copy ready, yes, and we've done it. A complete business website, no: rushing it means skipping the stage where problems get caught.

How long do you take for an online shop?

Between 10 and 15 working days, and the catalogue sets the pace. If you send us the product details and photos ready it's quick; if 300 products need preparing, it takes longer.

Do you work on several projects at once?

Yes, but with a limit. That's why the timeline we give is the real one and not an optimistic one: we'd rather say 15 days and deliver than say 5 and fail.

What happens if I'm late with the copy?

Nothing serious, but the timeline moves. The clock starts from when we have what we need; we tell you clearly so nobody gets a surprise.